Sector
- Municipal
- Parks and Rec
Client
- Metropolitan Water Reclamation District of Greater Chicago
Services Provided
- Civil Engineering
Location
- Wheeling, Illinois
Wheeling Park District (WPD) adopted a Master Plan for major recreational improvements to Heritage Park. As a subconsultant to AECOM, EDI was part of the team working on the MWRDGC Heritage Park Flood Control Facility project which incorporated the stormwater detention needs with the Park District’s Master Plan. Major Master Plan features included athletic fields and recreational paths.
As AECOM’s primary site civil design sub-consultant, EDI was responsible for many of the major Master Plan improvements planned for Heritage Park. EDI prepared contract plans and specifications for various site features including parking, drainage, sanitary sewers, water mains, erosion and sediment control plans and details for the entire park improvement area.
This project utilized AutoCAD Civil 3D and EDI’s in-depth experience with this software. The project team also benefited from EDI’s successful experience on other MWRDGC projects, as well as a comprehensive depth of experience with park district and site enhancement projects throughout the Chicago land area.